Projects in Design

Designing the Future of the Resort Corridor

These projects have begun design and construction will be scheduled in the near future.

Projects in Design

  • Las Vegas Boulevard at Bellagio – Pedestrian Bridge
  • Las Vegas Boulevard – Sunset Road to Spring Mountain –                        Resurface roadway, Water line, etc.
  • Dean Martin Drive – Frank Sinatra Drive to Ponderosa Way –                  Resurface roadway
  • Sammy Davis Jr. – Sahara Avenue to Frank Sinatra Drive –                      Resurface roadway
  • Frank Sinatra Drive – Dean Martin Drive to Russell Road –                        Resurface roadway
  • Paradise Road – Harmon Avenue to Desert Inn Road – Resurface        roadway, Water line, Storm Drain, etc
  • Tropicana/University Center Grade Separation – Intersection Re-        configuration
  • Harmon Avenue – Audrie Lane to Koval Lane – Resurface                        roadway
  • University Center – Flamingo Road to Sahara Avenue –                            Intelligent Traffic Systems

Sign-Up to Receive Important Updates!

We'll keep you informed about traffic updates and lane restrictions surrounding The Resort Corridor Projects. * Standard text message rates may apply