Eastern Avenue and Maryland Parkway Rehabilitation

Eastern Avenue and Maryland Parkway Rehabilitation

Project Description: Mill and overlay pavement on Maryland Parkway from Flamingo Road to Twain Avenue, and on Eastern Avenue from Flamingo Road to Desert Inn Road. Replace existing sidewalk ramps within project limits that do not meet current ADA standards. Adjust utility valves and manholes as required to accommodate roadway paving operations. Construct medians. Provide defector loop infrastructure at signalized intersection approaches. Replace damaged signs, add new signs, and re-stripe roadways.

CCPW Design Engineer: Blair Lecker, Blair.Lecker@clarkcountynv.gov, 702-455-6331

Design Consultant/Construction Contractor: Las Vegas Paving

Commission District: E

Construction Budget Estimate: $1,900,000

Construction Contract Length: April 8, 2019 – Sept. 4, 2019

 